Work described
From the filing***MIKE IS WORKING ON THIS**** Install a new 400-amp overhead meter socket on the front building. Install a 400-amp automatic transfer switch (ATS) adjacent to the meter socket. The ATS will be fed from a 60?kW Generac generator supplied by the customer. Form and pour a concrete generator pad, sized per manufacturer specifications. Install three conduits from the pad up to the ATS location on the building. The ATS will feed two 200-amp disconnects inside the building. One disconnect will feed a new 200-amp panel. The second disconnect will feed the existing panel. Install new grounding electrode system, including ground rods per code. CRS# C/A fee included
Browse
Permits in Hartford County, CTElectrical permitsMasonry / concrete permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Aug 7Residential Alteration Permit
64 HADDAM ST, HARTFORD, CT 06106 · Hartford
- Aug 7Residential Alteration Permit
5 LAMBERT LN, HARTFORD, CT 06120 · Hartford
- Aug 7Plumbing Permit
60 HUBBARD RD, HARTFORD, CT 06114 · Hartford
- Aug 7Plumbing Permit
60 SCHOOL ST, HARTFORD, CT 06106 · Hartford