Building permit · Hartford County, CT

Residential Alteration Permit

64 HADDAM ST, HARTFORD, CT 06106HartfordGeneral contractorDemolition

Work described

From the filing

PROPERTY DESCRIPTION 1- The following scope of work represents the fair and reasonable reconstruction required to restore the residence following water damage, fire-related damage, smoke damage, and asbestos abatement activities. 2- All reconstruction shall be performed by EDM Construction LLC in a professional and workmanlike manner in accordance with applicable building codes, manufacturer specifications, and industry standards. 3- The Owner acknowledges that the residence shall remain vacant during the reconstruction process. 4- EDM Construction LLC shall implement dust containment, floor protection, and jobsite safety measures necessary to minimize disruption to occupied living areas. Each room shall receive room-specific reconstruction as outlined in subsequent sections of this proposal. * PHASE I: GENERAL DEMOLITION, PROTECTION & SITE PREPARATION 5- Prior to reconstruction, EDM Construction LLC shall prepare the project site by protecting unaffected finishes, furnishings, flooring, mechanical systems, and personal property located within or adjacent to the work area. 6- Protective measures shall include floor protection systems consisting of cardboard, protective coverings, tape systems, plastic barriers, zipper access openings, dust-control containment walls, tension-post barrier systems, and temporary isolation of work areas as required. 7- Where reconstruction activities create airborne dust or debris, negative air machines, air scrubbers, ducting systems, and containment procedures shall be utilized. 8- Due to the limited access to the basement and the absence of a bulkhead or direct exterior access point, additional labor shall be provided for the removal, transport, and disposal of demolition debris. 9- EDM Construction will be renting two (2) 16 x 8 - POD's (Storage Container) to store any salvaged belongings or appliances while working this project to protect from any debris or damage up to 4 months (or length of project). 10- All demolition debris generated by reconstruction activities shall be removed from the property and disposed of in accordance with applicable federal, state, and local regulations. 11- Any concealed damage discovered during demolition shall be documented and addressed through a written change order and, where applicable, an insurance supplement.

Browse

Permits in Hartford County, CTGeneral contractor permitsDemolition permitsOpen bids in Hartford County

Other recent filings nearby

Hartford County, CT
Residential Alteration Permit — 64 HADDAM ST, HARTFORD, CT 06106 — Townline