***MIKE IS WORKING ON THIS**** Install a new 400-amp overhead meter socket on the front building. Install a 400-amp automatic transfer switch (ATS) adjacent to the meter socket. The ATS will be fed from a 60?kW Generac generator supplied by the customer. Form and pour a concrete generator pad, sized per manufacturer specifications. Install three conduits from the pad up to the ATS location on the building. The ATS will feed two 200-amp disconnects inside the building. One disconnect will feed a new 200-amp panel. The second disconnect will feed the existing panel. Install new grounding electrode system, including ground rods per code. CRS# C/A fee included
Valuation
$22K
Filed
Aug 7, 2026
Lot
052009
Locked on the free plan
ProPermit record
- Permit no.
- E-26-48344
- Municipality
- Town of Southington
- Block / lot
- 052009
- Trade
- Electrical
- Work type
- Electrical
Property
Assessor record- Type
- Manufacturing Facilities
- Built
- 1940
- Living area
- 44,729 sq ft
- Appraised
- $2,343,930
- Last sold
- Dec 1975
At this property
1 other permitHistory