Work described
From the filinggrass, graveled or sidewalk areas disturbed shall be constructed, top soiled, seeded and mulched within 14 days of completion of excavation. Replace entire slab of sidewalk. Do not park equipment in Municipal Lot unless you have approval from WOPD.
Browse
Permits in Essex County, NJExcavation / sitework / septic permitsOpen bids in Essex County
Other recent filings nearby
Essex County, NJ- Jul 30Utility
78, Lawrence Ave · Township of West Orange
- Jul 30Utility
165, Watchung Ave · Township of West Orange
- Jul 30Sewer Capping - Connection
552 VALLEY ROAD · Township of West Orange
- Jul 30Water Heater Permit
5 JOYCE STREET · Township of West Orange