Permit

9 Carlson Rd

IssuedTownship of West Orange · Excavation / sitework / septic · filed Sep 18+1 more at this address

grass, graveled or sidewalk areas disturbed shall be constructed, top soiled, seeded and mulched within 14 days of completion of excavation. Replace entire slab of sidewalk. Do not park equipment in Municipal Lot unless you have approval from WOPD.

Valuation
Filed
Sep 18, 2025
Lot
0722 172.23 33.02

Permit record

Permit no.
ENG2025-095
Municipality
Township of West Orange
Block / lot
0722 172.23 33.02
Trade
Excavation / sitework / septic
Work type
Sidewalk and Curb Opening

At this property

1 other permit
Same job