Work described
From the filingSET 3-120G AG HORIZONTAL LP TANKS ON BLOCKS. RUN 3/4 BM INTO THE UNFINISHED BASEMENT ALONG THE JOISTS TO THE NEW BOILER LOCATION BY OTHERS WITH A SHUT OFF. SET FOR TEST. MAKE FINAL CONNECTIONS. TIE IN WITH 1/2 BM DROP, SHUT OFF, UNION SEDIMENT TRAP AND LEAK CHECK UPON APPROVAL. OTHERS TO FIRE. Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed. 1. LP tanks are to be installed at proper distances to any building openings and/or ignition sources. NFPA 58 6.4.4.3 table 2. Provide proper separation distance from any building and property lines. NFPA 58 6.4.1.1
Browse
Permits in Hartford County, CTHVAC / heating / cooling permitsGeneral contractor permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Aug 7Residential Alteration Permit
64 HADDAM ST, HARTFORD, CT 06106 · Hartford
- Aug 7Residential Alteration Permit
5 LAMBERT LN, HARTFORD, CT 06120 · Hartford
- Aug 7Plumbing Permit
60 HUBBARD RD, HARTFORD, CT 06114 · Hartford
- Aug 7Plumbing Permit
60 SCHOOL ST, HARTFORD, CT 06106 · Hartford