Townline
Building permit · Hartford County, CT

Solar Panel - Roof mount

9 HARTLAND ROADSimsburySolarRoofing / siding / gutters

Work described

From the filing

Roof mounted solar system with 39 panels (16.965 kW) Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. Please review our comments listed below. Conditions are subjected to field inspections. 1. NO STRUCTURAL UPGRADE IS REQUIRED- on the existing structure for installation of the array(s) as proposed, per provided engineer’s evaluation. 2. Roof access and pathways are to be provided per ’21 IRC section R324.6 of the ’22 CT State Building Code. 3. PV Array occupancy not more than 33% of plan view total roof area, shall have a clear setback of not less than 18 inches on both sides of horizontal ridge. IRC R324.6.2 4. Provide Smoke and CO Detectors per IRC for alterations, repairs and additions. IRC R314.2.2, R315.2.2

Browse

Permits in Hartford County, CTSolar permitsRoofing / siding / gutters permitsOpen bids in Hartford County

Other recent filings nearby

Hartford County, CT
Solar Panel - Roof mount — 9 HARTLAND ROAD — Townline