From the filingDrain the existing oil tank and safely retain the usable oil for reuse. The existing 275-gallon oil tank will then be disconnected from the associated piping, removed from the property, and properly disposed of. A new Roth oil (DWT100L) tank will be installed and connected to the existing oil system. As part of the installation, the existing undersized vent piping will be corrected and properly sized for the new tank installation. New Oil supply line will also be installed.