Work described
From the filing• Provide layout • All saw cut, bust and removal of concrete done by other • All excavation and exposure of existing pipe to be done by other • Cut into existing sewer piping for new tie in for new plumbing layout • Install sched 40 PVC sewer piping • Bed all pipe with clean #1 stone provided by others • Install Uponor waterlines with black foam insulation and copper stubouts • Install PVC Inwall drain, waste, and vent lines • Supply and install floor mounted gravity flush tanks, Ada drop in sinks and manual lav faucets. ADA toilets, 2 ADA drinking fountains, 2 six gallon Hot water tanks
Browse
Permits in Erie County, NYPlumbing / piping permitsInsulation permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Jul 28Interior Demolition / Tearout
129 Elmwood, Buffalo · Buffalo
- Jul 28Building Repair
24 Brinton, Buffalo · Buffalo
- Jul 28Building Repair
840 Richmond, Buffalo · Buffalo
- Jul 28Building Repair
501 Niagara, Buffalo · Buffalo