• Provide layout • All saw cut, bust and removal of concrete done by other • All excavation and exposure of existing pipe to be done by other • Cut into existing sewer piping for new tie in for new plumbing layout • Install sched 40 PVC sewer piping • Bed all pipe with clean #1 stone provided by others • Install Uponor waterlines with black foam insulation and copper stubouts • Install PVC Inwall drain, waste, and vent lines • Supply and install floor mounted gravity flush tanks, Ada drop in sinks and manual lav faucets. ADA toilets, 2 ADA drinking fountains, 2 six gallon Hot water tanks
Valuation
$82.5K
Filed
Jun 30, 2026
Lot
1013800001001000
Locked on the free plan
ProPermit record
- Permit no.
- PLUM26-9694328
- Municipality
- Buffalo
- Block / lot
- 1013800001001000
- Trade
- Plumbing / piping
- Work type
- Plumbing
At this property
4 other permitsSame job
History