Work described
From the filing( " The Malt House " - Stabilization ) Project to include full replacement of roof deck and membrane, additional support steel and exterior masonry restoration. A separate Demolition Permit is required for portions of the existing structure to be removed. *** Digeplan *** <div><br></div><div>*** Preservation *** *** Attached Asbestos Survey *** </div><div>*** All separate required mechanical, electrical and plumbing permits must be applied for as needed per permit. *** </div><div>*** A separate DPW permit is required for any obstruction of the City of Buffalo right-of-way. *** </div><div>*** Contractor is responsible to provide the building inspector with an asbestos clearance letter prior to final inspection. *** </div>
Browse
Permits in Erie County, NYGeneral contractor permitsDemolition permitsOpen bids in Erie County
Other recent filings nearby
Erie County, NY- Nov 3Interior Demolition / Tearout
62 Frank, Buffalo · Buffalo
- Nov 3Building Repair
55 Crestwood, Buffalo · Buffalo
- Nov 3Building Repair
300 Seventh, Buffalo · Buffalo
- Nov 3Building Repair (Plans)
95 Johnson Pk, Buffalo · Buffalo