Scope
This is an approximately $15 million electrical-infrastructure project for a second electrical feed, with online Building Connected bidding due September 17, 2026 at 2:00 PM ET; bid, labor and material payment, and performance bonds are required, and DAS prequalification applies because the bid exceeds $1 million. The pre-bid meeting and walkthrough is non-mandatory on July 23, 2026 at 10:00 AM ET, additional RFIs are due September 3, 2026 at 5:00 PM ET, and mandatory alternates and Addendum #3 acknowledgement are required; no prevailing-wage or insurance requirement is stated.
Requirements
From the notice to bidders- Mandatory alternates
- Required
- Additional RFI deadline
- Required
- RFI deadline 9/03/2026 5:00 PM
- Required
- Addendum acknowledgement
- Required
- Bonding
- Required
- DAS prequalification
- Required
- Whiting-Turner prequalification
- Required
- Pre-bid meeting and walkthrough
- Optional
- How to apply
- Required
- Budget
- approximately $15 million (total estimated value)
Trades called for
1 matchedElectrical
Browse
Other open bids nearby
Tolland County, CT- Sep 3EE-26-011 Discovery Drive Solar Array PilotUniversity of Connecticut - Stamford
- Sep 3Discovery Drive Solar Array PilotUniversity of Connecticut - Stamford
- Sep 15WPCF Steel Canopy, Foundations & Site RestorationTown of Stafford