Townline
Public bid · Tolland County, CT

WPCF Steel Canopy, Foundations & Site Restoration

Town of StaffordTown of Stafford Water Pollution Control Facility (WPCF), 50 River Rd., Stafford Springs, ConnecticutExcavation / sitework / septicMasonry / concrete

Scope

This is a steel canopy, foundations, and site-restoration job requiring a performance bond upon award, proof of insurance with the proposal, and Connecticut-licensed Professional Engineer-stamped structural drawings; no prevailing-wage requirement is indicated. An optional, one-time site visit is scheduled for August 28, 2026 at 9:00 AM ET, and complete proposals with a lump-sum price and schedule details must be submitted by email by September 15, 2026 at 2:00 PM ET.

Requirements

From the notice to bidders
Insurance
Required
Site Visit
Scheduled
Bonding
Required
Site visit
Optional
Complete proposal submission
Required
How to apply
Required
Budget
Not listed

Trades called for

3 matched
Excavation / sitework / septicMasonry / concreteSheet metal

Browse

Bids in Tolland County, CTExcavation / sitework / septic bidsMasonry / concrete bidsSheet metal bids

Other open bids nearby

Tolland County, CT