Work described
From the filingEZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 25' 1/2" gas line pipe, shut-off valve, and gas flexline for stove. The flexline piping is being installed from the floor to the stove. No drywall is being removed or replaced. PHDC WORK ORDER #225541
Browse
Permits in Philadelphia County, PAHVAC / heating / cooling permitsGeneral contractor permitsOpen bids in Philadelphia County
Other recent filings nearby
Philadelphia County, PA- Sep 30Zoning — Lot Line Relocation
1411 S FRANKLIN ST · Philadelphia
- Sep 30Zoning — Change of Use
119 N 3RD ST · Philadelphia
- Sep 30Zoning — Change of Use
4050 LANCASTER AVE · Philadelphia
- Sep 30Zoning — New construction, addition, GFA change
1343 E OXFORD ST · Philadelphia