Work described
From the filingMain Electrical Panel: Install 1 main panel in the basement, distributing power to sub-panels on each floor. Wiring: Run copper wiring from the main panel to sub-panels and outlets. Install dedicated circuits for HVAC units and appliances. Lighting: Install recessed lights, pendant fixtures, and wall-mounted lights as per the lighting schedule. Provide switches for each fixture. Outlets: Install general outlets and dedicated appliance outlets in each unit, with GFCI outlets in kitchens and bathrooms. Grounding: Ensure proper grounding for the entire system as per code. Safety Devices: Install hard-wired smoke detectors and CO detectors in each unit.-2017 NEC. All work to be done according to the 2017 NEC and per approved plans. (The fire alarm system is not included in the scope of work.)
Browse
Permits in Philadelphia County, PAGeneral contractor permitsElectrical permitsOpen bids in Philadelphia County
Other recent filings nearby
Philadelphia County, PA- Sep 30Zoning — Change of Use
1911 FITZWATER ST · Philadelphia
- Sep 29Zoning — Change of Use
1745 N 21ST ST · Philadelphia
- Sep 29Zoning — New construction, addition, GFA change
2008 PEMBERTON ST · Philadelphia
- Sep 29Zoning — New construction, addition, GFA change
2053 AMBER ST · Philadelphia