Work described
From the filingInstalling 1 sump pump and 30 LNFT basement gutter KIMBERLY NORMAN-ROSEDAM - CHIEF BUILDING OFFICIAL - PERMIT CONDITIONS [WHERE APPLICABLE]: R105.7 – PLACEMENT OF PERMIT: THE BUILDING PERMIT, OR A COPY AND BUILDING CONSTRUCTION DOCUMENTS/PLANS SHALL BE KEPT ON-SITE AT ALL TIMES UNTIL COMPLETION OF THE PROJECT. SHALL COMPLY WITH 2022 CONNECTICUT STATE BUILDING CODE, SHALL COMPLY WITH 2021 IPC AND/OR 2021 IRC CHAPTER 26 -29 – PLUMBING SYSTEMS