ENGINEERED PLAN REVIEW
13 BEACH CT
Proposed teardown & rebuild of the existing 3-bed year-round dwelling. No new bedrooms are proposed. The new dwelling will be fully FEMA compliant. A new septic system is proposed and the existing system will be removed or properly abandoned. Coastal Site Plan prepared by Indigo Land Design LLC dated November 3, 2025, last revised 2/10/26. Elevations & Floor Plans prepared by Craig A. Laliberte, Architect, dated January 28, 2026, last revised 2/10/26.\n\nRevised plan 3-18-26
Excavation / sitework / septic
Townline watches town and county permit feeds so new filings like this reach you the day they land — matched to your trades, with owner and applicant contacts on Pro.
More permits in Middlesex County, CT· Excavation / sitework / septic permits