Townline
Building permit

B100a - Engineered Plan Review for New or Repaired Septic System

76 POST AVE

Filed March 2, 2026·Town of Westbrook· Permit Issued

The applicant is proposing to winterize the existing 2-Bedroom seasonal dwelling, remove the existing cesspool and replace it with a new 100 % Connecticut Public Health Code Complaint Septic System. No changes to the existing dwelling are proposed at this time. Winterization Plan prepared by Indigo Land Design, LLC, dated December 15, 2025. \n\n2/9/26 Rec'd Revised Plan, last revised 2-9-26.\n\n2/9/26 - The proposed SSDS is more than 12" below grade, therefore the design requires MLSS calculations. - LA \n\n2/19/26 rec'd Revised Plan, last revised 2/17/26.

General contractor · Excavation / sitework / septic

Townline watches town and county permit feeds so new filings like this reach you the day they land — matched to your trades, with owner and applicant contacts on Pro.

More permits in Middlesex County, CT· General contractor permits· Excavation / sitework / septic permits

B100a - Engineered Plan Review for New or Repaired Septic System — 76 POST AVE — Townline