Work described
From the filingADDITIONAL WORK RELATED TO B-25-551 FIRST FLOOR FRAME BETWEEN EXPOSED BEAMS TO INSTALL DRYWALL. ALSO FRAME BETWEEN BEAMS IN KITCHEN AND BATH FOR DRYWALL. 2ND FLOOR REMOVED ALL EXISTING DRYWALL AND INSULATION TO INSTALL ALL NEW CLOSED CELL AND DRYWALL.
Browse
Permits in New London County, CTGeneral contractor permitsInsulation permitsOpen bids in New London County
Other recent filings nearby
New London County, CT- Jul 29Stonington Roof/Window(s)/Door(s)/All types of Exterior Siding. Commercial and Residential.
28 LIBERTY ST, PAWCATUCK, CT 06379 · Pawcatuck
- Jul 29Stonington Plumbing Permit
16 REYNOLDS HILL RD, MYSTIC, CT 06355 · Mystic
- Jul 29Stonington Plumbing Permit
118 PEQUOT TR, PAWCATUCK, CT 06379 · Pawcatuck
- Jul 29Stonington Residential Building Permit Application
38 DEER RIDGE RD, STONINGTON, CT 06378 · Stonington