Work described
From the filingSEWER PERMIT CONSTRUCTION OF A FORCED SEWER MAIN FOR NEW SINGLE FAMILY HOME **CONTRACTOR REQUIRED TO CONTACT CAMO POLLUTION FOR PRE-CONSTRUCTION MEETING** **TRENCH INSPECTION REQUIRED PRIOR TO BACKFILL. TRACER TAPE AND SAND MUST BE ON SITE DURING INSPECTION. CAMO POLLUTION OR BUILDING INSPECTOR TO DO ALL REQUIRED INSPECTIONS** **HOOK-UP IS REQUIRED TO BE COMPLETED PER TOWN SPECIFICATIONS. SEE ATTACHED** **IF TOWN, COUNTY OR STATE RIGHT OF WAY/ROAD IS DISTURBED, ADDITIONAL PERMITS MAY NEED TO BE OBTAINED FROM ENTITY WITH JURISDICTION** **CAMO POLLUTION: 845-463-7310** **CALL 811 BEFORE YOU DIG**
Browse
Permits in Dutchess County, NYPlumbing / piping permitsExcavation / sitework / septic permitsOpen bids in Dutchess County
Other recent filings nearby
Dutchess County, NY- Aug 24MECHANICAL
101 Nelson Ave · Village of Wappingers Falls
- Aug 24BOILER/FURNACE
12 Dwyer Ln · Town of Wappinger
- Aug 24NEW RES
213 Old Hopewell Rd · Town of Wappinger
- Aug 24RENOVATION(R)
15 Obrien Hill Rd · Town of Union Vale