Building permit
Gas Line
29 Park Hill Dr
Filed June 30, 2026·Town of Wappinger· OPEN
GAS LINE FROM EXISTING TANK TO NEW GENERATOR\n**ANY OUTDOOR UNIT(S) ARE NOT PERMITTED ON/IN FRONT OF RESIDENCE**\n**INSTALLATION MUST COMPLY WITH MANUFACTURER SPECIFICATIONS**\n**NEED GAS PRESSURE TEST**\n**NEED PASSING FINAL ELECTRICAL INSPECTION BY TOWN APPROVED ELECTRICAL INSPECTOR**\n**NEED INSPECTION FOR SMOKE AND CO DETECTORS PER CODE THROUGHOUT DWELLING**\n**CALL INTO OUR OFFICE FOR FINAL INSPECTION BY TOWN BUILDING INSPECTOR**\n\n
Plumbing / piping · Electrical
Townline watches town and county permit feeds so new filings like this reach you the day they land — matched to your trades, with owner and applicant contacts on Pro.
More permits in Dutchess County, NY· Plumbing / piping permits· Electrical permits