Work described
From the filingSEWER HOOKUP - CONNECTING TO TOWN SEWER **WORK SHOULD NOT BEGIN UNTIL INSPECTIONS ARE COORDINATED WITH BUILDING DEPARTMENT** **SEPTIC MUST BE PROPERLY ABANDONED TO DUTCHESS COUNTY DEPARTMENT OF HEALTH STANDARDS. A NOTARIZED LETTER WILL NEED TO BE SUBMITTED CERTIFYING THE ABANDONMENT** **CONTRACTOR REQUIRED TO CONTACT CAMO POLLUTION FOR PRE-CONSTRUCTION MEETING** **TRENCH INSPECTION REQUIRED PRIOR TO BACKFILL. TRACER TAPE AND SAND MUST BE ON SITE DURING INSPECTION. CAMO POLLUTION OR BUILDING INSPECTOR TO DO ALL REQUIRED INSPECTIONS** **HOOK-UP IS REQUIRED TO BE COMPLETED PER TOWN SPECIFICATIONS. SEE ATTACHED** **IF TOWN, COUNTY OR STATE RIGHT OF WAY/ROAD IS DISTURBED, ADDITIONAL PERMITS MAY NEED TO BE OBTAINED FROM ENTITY WITH JURISDICTION**
Browse
Permits in Dutchess County, NYPlumbing / piping permitsExcavation / sitework / septic permitsOpen bids in Dutchess County
Other recent filings nearby
Dutchess County, NY- Sep 4Building Permit Application
110 - 112 Phillips Rd, Hopewell Junction, NY 12533 · Hopewell Junction
- Sep 4Building Permit Application
329 Oak Ridge Rd, Hopewell Junction, NY 12533 · Hopewell Junction
- Sep 4Building Permit Application
18 Hausner Dr, Hopewell Junction, NY 12533 · Hopewell Junction
- Sep 4Building Permit Application
15 Flagler Rd, Hopewell Junction, NY 12533 · Hopewell Junction