Townline
Building permit · Rockland County, NY

1 FAM

33 North StTown of Stony PointGeneral contractor

Work described

From the filing

1 FAMILY - construction of new two-story single family residence CONDITIONS: 1. Flood Plain Development Permit required 2. Sewer connection permit and petition for inclusion in district required prior to sewer installation 3. Town Highway "street opening permit" required prior to mobilization of equipment

Browse

Permits in Rockland County, NYGeneral contractor permitsOpen bids in Rockland County

Other recent filings nearby

Rockland County, NY
  • Sep 22
    ROOF

    92 Washburns Ln · Town of Stony Point

  • Sep 22
    DEMO-RESIDENTIAL

    33 OLD ROUTE 202A · Town of Ramapo

  • Sep 22
    DEMO-RESIDENTIAL

    180 REMSEN AV · Town of Ramapo

  • Sep 22
    ADDITION

    11 DOVER TERR · Town of Ramapo