Work described
From the filingto replenish the beach between the 4-foot and 6-foot contour lines using clean beach sand; a total of 244 cubic yards brought in to raise elevation to 6-foot with 10-foot wide transitional area; plant with approximately 6,000 Cape American beach grass plants 12” on-center; and provide 4’ wide beach access path; all as depicted on the site plan prepared by David Bergen and Ken Quigley, received on August 17, 2026, and stamped approved on October 14, 2026
Browse
Permits in Suffolk County, NYGeneral contractor permitsOpen bids in Suffolk County
Other recent filings nearby
Suffolk County, NY- Oct 19ADDITION/ALTERATION
22 SUNSET RD · Village of North Haven
- Oct 19FENCE
40 ON THE BLUFF · Village of North Haven
- Oct 16ELECTRICAL- RESIDENTIAL
48455 CR 48 · Town of Southold
- Oct 16SINGLE FAMILY DWELLING- ADDITION AND ALTERATION
965 Pike St · Town of Southold