Townline
Building permit · New Haven County, CT

ELECTRICAL

31 GRECENKO CIRCLESouthburyElectrical

Work described

From the filing

Hardwiring a GMC PowerUp to a 32-amp EVSE mounted on the home's exterior wall. Tapping the load side of the main breaker disconnect at the meter socket A disconnect box with a 40-amp breaker will be placed right next to the meter socket. Installing a 3/4-inch EMT raceway for the EVSE that will be mounted within 10 ft. of the meter socket. The EVSE has built-in GFCI protection

Browse

Permits in New Haven County, CTElectrical permitsOpen bids in New Haven County

Other recent filings nearby

New Haven County, CT
  • Oct 20
    Residential Building

    35 Independence · Middlebury

  • Oct 20
    Residential Building

    190 Northfarms Road · Middlebury

  • Oct 19
    PLUMBING

    851 HERITAGE VILLAGE #A · Southbury

  • Oct 19
    PLUMBING

    110 LAURELWOOD LANE · Southbury

ELECTRICAL — 31 GRECENKO CIRCLE — Townline