Townline
Building permit · Hartford County, CT

Plumbing

10 ARDSLEY WAYSimsburyPlumbing / pipingGeneral contractor

Work described

From the filing

Remodel existing master bathroom Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed. 1. When shower liners are water tight by materials from IRC P2709.2 and before tile is installed. A shower pan test will be required before membrane are concealed. This test is to follow all requirements of IRC P2503.6

Browse

Permits in Hartford County, CTPlumbing / piping permitsGeneral contractor permitsOpen bids in Hartford County

Other recent filings nearby

Hartford County, CT