Work described
From the filingInstallation of 1 Pure Pro Trio 3 Section Cast iron triple pass oil boiler with Carlin oil burner and Hydro level control. Also includes a Magnetic Hydro separator. Also included in this estimate is a stainless steel 40 gallon Heat flow stainless steel indirect water heater. New boiler to be piped for 1 zone heat and 1 zone hot water and provision for 1 future zone. Installation to include isolation valves, control valves, operating and safety controls, auto feeder, expansion tank, relief valve, backflow preventor, electrical, and venting to chimney. New boiler to be connected to existing heat loop piping. Installation includes draining, disconnecting, removal and disposal of existing boiler and indirect. Boiler will be installed on concrete block base and oil line and tiger loop will be configured for good accessibility on the new boiler. 8 Way water treatment to be added to aid in protecting new boiler and existing piping and radiators, valves and circulator. Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. Please review our comments listed below. Conditions are subjected to field inspections. 1.C/O detection per IRC 315.2.2 2.Installation shall comply with the 2022 CT State Building Code and the manufacturers specifications. M1401.1
Browse
Permits in Hartford County, CTHVAC / heating / cooling permitsPlumbing / piping permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Sep 3Electrical Permit
532 FORBES ST, EAST HARTFORD, CT 06118 · East Hartford
- Sep 2Plumbing Permit
1 Phaeton St, Windsor, CT 06095 · Windsor
- Sep 2Plumbing Permit
7 DALLY FARM RD, Windsor, CT 06095 · Windsor
- Sep 2HVAC Permit
28 RHODORA TERR, Windsor, CT 06095 · Windsor