Townline
Building permit

AC New

8 FAWNBROOK LANE

Filed July 23, 2026·SimsburyTownCT· Issued

The new installation of Daikin brand 5MXT40AJU9 condenser with (5) matching heads and controls for family room and (4) 2nd floor bedrooms. \n\nYour application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.\n\n1. Electrical permit shall be required R105.1\n2. Installation shall comply with the 2022 CT State Building Code and the manufacturers specifications. M1401.1\n3.Water level monitoring device shall be installed per M 1411.3.1.1

General contractor · Electrical

Townline watches town and county permit feeds so new filings like this reach you the day they land — matched to your trades, with owner and applicant contacts on Pro.

More permits in Hartford County, CT· General contractor permits· Electrical permits