Work described
From the filingRelocate existing gas lines to make space for an addition Underground 3/4 plastic to now be run through a conduit beneath a slab to a new riser location outside of the footings Disconnect 15' of 3/4 CSST and rep[lace with 3/4 black pipe dropped to the foundation below Test on all for inspection Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed. * The gas line shall enter the conduit above grade and exit the conduit above grade*
Browse
Permits in Hartford County, CTPlumbing / piping permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Jul 31Building Permit
34 CAPEN ST, Windsor, CT 06095 · Windsor
- Jul 31Mechanical Permit
116 GOFF BROOK CIR, Wethersfield, CT 61092280 · Wethersfield
- Jul 31Mechanical Permit
508 TWIN CIRCLE DR, South Windsor, CT 6074 · South Windsor
- Jul 31Building Permit
239 MASKEL RD, South Windsor, CT 6074 · South Windsor