Work described
From the filingInstall a hardwired Level 2 EV charger and a generator interlock kit. Install a 60-amp 2-pole breaker for the EV charger and a 50-amp 2-pole breaker for the generator in the existing 200-amp GE main panel in the basement. Make breaker space by installing tandem breakers or by relocating four circuits to the existing GE subpanel. Install a listed GE interlock kit on the main panel and an Emporia Vue energy monitor. Run #6 MC for the EV charger circuit and 6/3 MC for the generator circuit from the basement to the garage, continuing in EMT inside the garage. Mount a power inlet box on the right interior garage wall. Mount the Emporia Pro EV charger on the interior column between the right and center garage bays, hardwired and set to 48 amps on a 60-amp circui Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed. 1. C/O detection per IRC 315.2.2 2.Any and all electrical work is to follow all applicable sections of the 2022 State of Connecticut Building and 2020 NFPA 70 National Electrical Code.
Browse
Permits in Hartford County, CTGeneral contractor permitsElectrical permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Oct 14PZ - Zoning Permit
30 JENSEN CT (TP) · Town of Southington
- Oct 14Sewer Connection
207-24 LAZY LN · Town of Southington
- Oct 14Sewer Connection
207-20 LAZY LN · Town of Southington
- Oct 14Sewer Connection
207-19 LAZY LN · Town of Southington