Building permit · Hartford County, CT

Electric Service Change/Upgrade

179 OLD FARMS ROADSimsburyElectrical

Work described

From the filing

Disconnect and remove existing 100a service (point of service attachment, riser cable/conduit, meter and meter enclosure, cable/conduit entry into house load center, 100a load center with existing branch circuits. Any existing grounding electrode conductors. Furnish and install the following: 50 Amp generator interlock kit on the main electrical panel. The interlock kit will prevent the main breaker and generator breaker to be on at the same time. Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed. 1.Any and all electrical work is to follow all applicable sections of the 2022 State of Connecticut Building and 2020 NFPA 70 National Electrical Code. 2. C/O detection per IRC 315.2.2

Browse

Permits in Hartford County, CTElectrical permitsOpen bids in Hartford County

Other recent filings nearby

Hartford County, CT
Electric Service Change/Upgrade — 179 OLD FARMS ROAD — Townline