Work described
From the filingDisconnect and remove existing 100a service (point of service attachment, riser cable/conduit, meter and meter enclosure, cable/conduit entry into house load center, 100a load center with existing branch circuits. Any existing grounding electrode conductors. Furnish and install the following: 50 Amp generator interlock kit on the main electrical panel. The interlock kit will prevent the main breaker and generator breaker to be on at the same time. Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed. 1.Any and all electrical work is to follow all applicable sections of the 2022 State of Connecticut Building and 2020 NFPA 70 National Electrical Code. 2. C/O detection per IRC 315.2.2
Browse
Permits in Hartford County, CTElectrical permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Sep 14Residential Alteration Permit
30 BROOK ST HARTFORD CT 06120 · Hartford
- Sep 14Residential Alteration Permit
227 SARGEANT ST HARTFORD CT 06105 · Hartford
- Sep 14Plumbing Permit
74 WESTBOURNE PKWY HARTFORD CT 06112 · Hartford
- Sep 14Plumbing Permit
14 SHERBROOKE AV HARTFORD CT 06106 · Hartford