Work described
From the filingReplace existing lights with LED type retrofit supplied by other. Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed. 1. Light fixtures are to be UL listed and installed to manufacture`s instructions. NFPA 70 110.3 (B) 2. Light fixtures energy consumption is to follow IECC. table C405.3.2 (1)
Browse
Permits in Hartford County, CTElectrical permitsWaterproofing / drainage permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Aug 12Residential Solar/PV Permit
95 EUCLID ST WEST, HARTFORD, CT 06112 · Hartford
- Aug 12Residential Alteration Permit
221 THOMASTON ST, HARTFORD, CT 06112 · Hartford
- Aug 12Residential Alteration Permit
86 BLOOMFIELD AV, HARTFORD, CT 06105 · Hartford
- Aug 12Temporary Structure Permit
3340 MAIN ST, HARTFORD, CT 06120 · Hartford