Work described
From the filingInstalling 5.74kW DC PC roof mounted with 14 panels with Tesla Powerwall 3 battery with Tesla Powerwall control panel. 1. NO STRUCTURAL UPGRADE IS REQUIRED- on the existing structure for installation of the array(s) as proposed, per provided engineer’s evaluation. 2.. PV Array occupancy not more than 33% of plan view total roof area, shall have a clear setback of not less than 18 inches on both sides of horizontal ridge. IRC R324.6.2 3.C/O detection per IRC 315.2.2
Browse
Permits in Hartford County, CTSolar permitsRoofing / siding / gutters permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Oct 12Sheds under 200SQFT
9 SUNSET HILL ROAD · Simsbury
- Oct 12Plumbing
70 HOPMEADOW STREET · Simsbury
- Oct 12Gas Line - Plumbing
225 HOPMEADOW STREET · Simsbury
- Oct 12Oil Tank Basement
44 SUNSET HILL ROAD · Simsbury