Building permit · Hartford County, CT

Solar Panel - Roof mount

15 LOSTBROOK ROADSimsburySolarRoofing / siding / gutters

Work described

From the filing

Installing 5.74kW DC PC roof mounted with 14 panels with Tesla Powerwall 3 battery with Tesla Powerwall control panel. 1. NO STRUCTURAL UPGRADE IS REQUIRED- on the existing structure for installation of the array(s) as proposed, per provided engineer’s evaluation. 2.. PV Array occupancy not more than 33% of plan view total roof area, shall have a clear setback of not less than 18 inches on both sides of horizontal ridge. IRC R324.6.2 3.C/O detection per IRC 315.2.2