Work described
From the filingDemolition Remove toilet, vanity, tile flooring and walls, and prep for rebuild Rebuild Skim coat walls from tile removal Install new tile, vanity, toilet, trim walls as desired by client Paint, trim and finish as required Add beadboard or chair rail to walls NOTE: no plumbing or electrical work Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed. 1.Separate Electrical, Plumbing, and Mechanical permits may need to be applied for. If work in these areas are being updated/repaired, or altered. IRC R105.1 (plumbing permit shall be required for the plumbing re installation) . 2.Provide Smoke and CO Detectors per IRC for alterations and additions. IRC R314.2.2, R315.2.2 3.This approval is based on no structural work being done. Any relocation/removal of walls is assumed to be nonstructural. Any structural modifications, if required, shall be submitted to the building department for approval.
Browse
Permits in Hartford County, CTGeneral contractor permitsDemolition permitsOpen bids in Hartford County
Other recent filings nearby
Hartford County, CT- Oct 6PZ - Zoning Permit
90 POND MILL RD · Town of Southington
- Oct 6Excavation - Driveway/Sidewalk
33 PRELI CT · Town of Southington
- Oct 6Excavation - Driveway/Sidewalk
228 HILLTOP DR · Town of Southington
- Oct 6Excavation - ROW
80 BUCKLAND ST · Town of Southington