Work described
From the filingInstall roof mounted solar panel and 2 Tesla Powerwall3 Energy Storage Systems in mechanical room as per plan submitted & approved. Special Conditions: Original electrical underwriter certificate & a letter from architect/engineer stating both panels and solar battery were installed & inspected as per specs submitted must be submitted prior to issuance of CO. Contractor: Green Logic
Browse
Permits in Suffolk County, NYSolar permitsRoofing / siding / gutters permitsOpen bids in Suffolk County
Other recent filings nearby
Suffolk County, NY- Aug 24Swimming Pool with Fence- In Ground
600 Inlet View E · Town of Southold
- Aug 24AS BUILT GENERATOR
2910 Park Ave · Town of Southold
- Aug 24AS BUILT ALTERATION
1290 Rocky Point Rd · Town of Southold
- Aug 24ELECTRICAL- RESIDENTIAL
Peconic Bay · Town of Southold