Townline
Building permit · Suffolk County, NY

SFR 2 STORY

46 Hilo DrShelter IslandInsulationElectrical

Work described

From the filing

Construct a new 3906 sq. ft.' four- bedroom dwelling with 150 KW generator, new driveway gravel walkways, parking area 800 AMP service, two 1000-gallon UG buried propane tanks and mechanical system as per plans submitted & approved by Bldg. Dept. Special Conditions: Surveyor to stake 100' wetlands and foundation and stakes to remain in place throughout construction. Silt fencing required at regulated areas & to remain in place and maintained. NO materials/ equipment permitted in regulated areas. Radiant Heat in slab on grade requires a minimum of R-15 insulation. Buried propane tanks must be a minimum of 100' from all domestic water wells. Existing deck railings must be code compliant. A foundation survey must be submitted prior to start of framing with setbacks marked for East side of house. As per SCDHS R-R-25-1230, dated 2.25.26 for a max of 9 bedrooms, original electrical underwriter certificate, final as-built survey & green stamped BOH final survey showing all new improvements labeled with setbacks marked, septic registry, well registry, blower door/duct blast test results, elevator certification certificate, and elevation survey once highest point of framing is established and water test results, all must be submitted prior to issuance of CO. Contractor: Bocchino Theisen Builders

Browse

Permits in Suffolk County, NYInsulation permitsElectrical permitsOpen bids in Suffolk County

Other recent filings nearby

Suffolk County, NY