Townline
Building permit

Hot Tub-Spa

1 Tims Trail

Filed April 13, 2026·ShelterIslandTownNY· OPEN

Remove existing hot tub located on deck, replace deck boards as needed approx. 50 sq. ft.' and install new hot tub on concrete base as per survey submitted & approved by Bldg. Dept. Special Conditions: Hot tub will require a locking safety cover that complies with ASTM F1346. Hot tub required to be within zoning setbacks (20' side/rear, 40' front) Surveyor to stake 20' setback and stakes to remain in place, an original, stamped electrical underwriter's certificate and final survey showing location of hot tub are all required prior to issuance of CO. Contractor: Self

Electrical · Masonry / concrete · Carpentry / framing

Townline watches town and county permit feeds so new filings like this reach you the day they land — matched to your trades, with owner and applicant contacts on Pro.

More permits in Suffolk County, NY· Electrical permits· Masonry / concrete permits· Carpentry / framing permits

Hot Tub-Spa — 1 Tims Trail — Townline