POOL
10 Bluff Ave
Installation of an 8'x30' Gunite pool with an automatic cover and pool heater as per survey submitted. Special Conditions: Drywell inspection required. All pool ordinance & conditions apply. Temporary fence must be installed immediately at the start of construction & remain in place until permanent fence is installed within ninety days. Edge of bluff not to be disturbed and no heavy equipment allowed within the area outside the "Top of Bluff". Water receipt, original electrical underwriter certificate & updated final survey showing all new improvements & must meet all the requirements of the 2025 NY State Residential Pool Code must be submitted prior to issuance of CO. Separate permit required for any patio or decking or anything else not listed on this permit. Contractor: Binder Pools Inc.
Pool installation / service · Electrical · Masonry / concrete · Fencing
Townline watches town and county permit feeds so new filings like this reach you the day they land — matched to your trades, with owner and applicant contacts on Pro.
More permits in Suffolk County, NY· Pool installation / service permits· Electrical permits· Masonry / concrete permits