Demolition - Residential Other
13-15 De Laval Pl
DEMO COTTAGE DUE TO A TREE FALLING\n\n\nThis structure and use are legally nonconforming. If there are plans to rebuild, reconstruction must be completed within one year of the issuance of the demolition permit, consistent with §210-134(C), which states:\n“If any structure legally nonconforming in use shall be partially or totally destroyed by fire or any other means, it may be repaired or reconstructed to the same size and on the same location or at the location specified for new buildings in the district in which such use is located. All repairs or reconstruction for such nonconforming use shall be completed within one year of the date on which the destruction occurred.”
Demolition · General contractor
Townline watches town and county permit feeds so new filings like this reach you the day they land — matched to your trades, with owner and applicant contacts on Pro.
More permits in Dutchess County, NY· Demolition permits· General contractor permits