Work described
From the filing20 x 22 Detached Garage: concrete footing and floor. stick build with storage loft *Building permit, stamped approved plans and specifications, shall be kept together on the premises. Permits and stamped approved plans must be located and visible through a street side window. Approved plans shall be available for building department use only throughout the progress of work. *Site plan inspection required and as built survey for foundation will be necessary prior to start of framing *Licensed personnel under permit (Electrical, Plumbing, HVAC) *All other contractors to be licensed (mason, carpenter, etc.) *May be further notes on drawings *Must adhere to approved drawings only *All debris shall be removed properly **REQUIRED DOCUMENTS** AS BUILT Survey required before C.O. is issued **CALL FOR ALL INSPECTIONS 914-734-4134**
Browse
Permits in Westchester County, NYGeneral contractor permitsHVAC / heating / cooling permitsOpen bids in Westchester County
Other recent filings nearby
Westchester County, NY- Jul 29Unified Solar Application Permit
21 COOLEY PL, Mount Vernon, NY 10553 · Mount Vernon
- Jul 29Plumbing Permit - Mount Vernon
119 PELHAMDALE AV, Mount Vernon, NY 10553 · Mount Vernon
- Jul 29Electrical Permit - Mount Vernon
631 SEVENTH AV ,S, Mount Vernon, NY 10550 · Mount Vernon
- Jul 29Electrical Permit - Mount Vernon
321 RICH AV, Mount Vernon, NY 10552 · Mount Vernon