Work described
From the filing(Absolute Air) Installation of 18KW Generac Generator to be installed on the left side of the home same as existing ductless split condenser. The generator will be placed a minimum of 5' to the right of the condenser and to be positioned between the 2 windows. We will install a surface mounting gas pipe alongside the home to reach the generator location. We will install one uni-strut behind the generator if needed to allow us to strap our electrical wiring as well
Browse
Permits in Middlesex County, CTElectrical permitsHVAC / heating / cooling permitsOpen bids in Middlesex County