Work described
From the filing(Gen on Demand) The generator will be connected to the existing natural gas supply. New gas piping will be installed from the gas meter to the generator, sized per manufacturer requirements and fuel load calculations. All gas piping, shutoff valves, sediment traps, pressure testing, and connections will be installed in compliance with the International Fuel Gas Code (IFGC) and local regulations.