From the filingSingle-phase 120-240 volts. ConEd is installing a new line from the street to the meter. Relocating the meter enclosure because of large tree stumps about 20 feet away. Install new 200-amp meter enclosure with a new pedestal. Load side of the meter, customer load side - installing PVC Schedule 80 stub up from the trunch if permitted.