Townline
Building permit · New Haven County, CT

Plumbing - C

76 CHAPEL STCity of New HavenPlumbing / pipingGeneral contractor

Work described

From the filing

Installing 2 new bathrooms. One of the bathrooms in the shop area will be using a liberty ascent pump system. We will set toilet with pump in place and also the tie the sink into the same pump. All water lines will be ran in pex from the front of the building to the side and will be strapped in place ready to be connected to sink and toilet. Also for second floor bath will be piping in a toilet and sink, that piping will be ran down into crawl space area and tied into existing stack that is in place right now. Venting for said bath will run out the side of the building rising above the flood rim of the fixture it is serving by six inches. We also will be installing new slop sink on opposite side of shop bath. In shop area customer would like to have modine heater installed. We will run the gas to the unit and then run the exhaust to the outside of the building

Browse

Permits in New Haven County, CTPlumbing / piping permitsGeneral contractor permitsOpen bids in New Haven County

Other recent filings nearby

New Haven County, CT
Plumbing - C — 76 CHAPEL ST — Townline