Townline
Building permit · New London County, CT

Plumbing - Other

8 JENNIE DRMontvillePlumbing / piping

Work described

From the filing

Remove current tub drain move over 12 inch to set up for new shower customer will have the spec sheet new tie in, trap, and then tie into main stack 2 inch for new shower CUSTOMER IS INSTALLING THE SHOWER WE ARE JUST DOING A SMALL DRAIN REPAIR BO NOTES: This is not a drain repair. It is a drain size change out. From 1.5 inch to 2 inch for shower to meet manufacturer specs.

Browse

Permits in New London County, CTPlumbing / piping permitsOpen bids in New London County

Other recent filings nearby

New London County, CT