Townline
Building permit · New London County, CT

Electrical - Solar

20 CAROL DRMontvilleSolarElectrical

Work described

From the filing

Installing rooftop railed solar PV 8.2KW and 20 modules. Enphase Encharge 10 Solar Storage System. **9.30.26 - Admin Note - Cost of Construction modified to fit required $5 p/W (8200 * $5 $10,000 = $51,000).

Browse

Permits in New London County, CTSolar permitsElectrical permitsOpen bids in New London County

Other recent filings nearby

New London County, CT
Electrical - Solar — 20 CAROL DR — Townline