Work described
From the filingHardwiring a Tesla Wall Connector EVSE mounted inside the garage, set to 48 amps. Installing the 3/4-inch EMT and pulling #6 THHN/THWN-2 from the existing 100-amp subpanel inside the garage to the EVSE The existing 100-amp garage sub-panel is fed by an existing 200-amp subpanel on the other end of the home. We will install a 60-amp breaker in the panel to protect the EVSE. Also, installing a load-shedding device to protect the EV charger from overloading the 100 A subpanel. The charger has built-in GFCI protection
Browse
Permits in New London County, CTElectrical permitsOpen bids in New London County
Other recent filings nearby
New London County, CT- Aug 31Stonington Roof/Window(s)/Door(s)/All types of Exterior Siding. Commercial and Residential.
160 WATER ST, STONINGTON, CT 06378 · Stonington
- Aug 31Stonington Roof/Window(s)/Door(s)/All types of Exterior Siding. Commercial and Residential.
48 OLD NORTH RD, MYSTIC, CT 06355 · Mystic
- Aug 31Stonington Roof/Window(s)/Door(s)/All types of Exterior Siding. Commercial and Residential.
118 HATCH ST, MYSTIC, CT 06355 · Mystic
- Aug 31Stonington Electrical Permit
52 BARNES RD, STONINGTON, CT 06378 · Stonington