Townline
Building permit · Nassau County, NY

Building Permit

252 GARFIELD AVEVillage of MineolaGeneral contractor

Work described

From the filing

Direct replacement of one (1) air condenser as per code. All exterior mechanical equipment shall be fully screened from public view from both street frontages and must maintain a minimum three (3) foot setback from adjacent side and rear yard property line. FINAL INSPECTIONS ARE REQUIRED AFTER INSTALLATION. INSPECTIONS MUST BE SCHEDULED TWENTY-FOUR (24) TO FORTY-EIGHT (48) HOURS IN ADVANCE, MONDAY THROUGH FRIDAY, 9:30 AM TO 3:30 PM ONLY.

Browse

Permits in Nassau County, NYGeneral contractor permitsOpen bids in Nassau County

Other recent filings nearby

Nassau County, NY
  • Oct 20
    Tent

    100 PORT WASHINGTON BLVD · Village of Flower Hill

  • Oct 16
    Tree Removal Permit

    310 MOTTS COVE RD S · Roslyn Harbor

  • Oct 16
    SLIP PERMIT

    55 Rockville Ave · Rockville Centre

  • Oct 16
    SLIP PERMIT

    382 No Forest Ave · Rockville Centre

Building Permit — 252 GARFIELD AVE — Townline