Work described
From the filingThe construction of interior alterations to the existing third floor to create an ADA accessible bathroom within existing chemistry lab as per architectural plans prepared by Joseph M. Spina R.A. 6/18/26 and engineering plans prepared by Bruce J. Korrow P.E. 6/18/26. *No HVAC filed under this permit. *Any modifications to existing fire alarm/sprinkler system must be approved by the NCFM.
Browse
Permits in Nassau County, NYGeneral contractor permitsHVAC / heating / cooling permitsOpen bids in Nassau County
Other recent filings nearby
Nassau County, NY- Sep 9Construction Application- Lines & Grades
2 SAPIR ST, Valley Stream · Valley Stream
- Sep 9Building Permit Application
290 E EUCLID ST, Valley Stream · Valley Stream
- Sep 9Solar Panel Permit
59 Paul Ave, New Hyde Park, NY 11040 · New Hyde Park
- Sep 9Residential Building Permit
50 Oakdale Rd, Roslyn Heights, NY 11577 · Roslyn Heights