Building permit
REPAIR/REPLACE
95 Washington Ave
Filed May 29, 2026·Kingston· Permit Issued
Remove existing: walk-in shower, tile walls, and floor. Replace with new: Tub, tile walls, and floor. (No electrical work approved) Insulation to comply with [NY]2025 ECCNYS R503.1.1.3 Above-Grade Wall Alterations. New tub to comply with 2025 RCNYS R327.1 Space Required
Insulation · Electrical
Townline watches town and county permit feeds so new filings like this reach you the day they land — matched to your trades, with owner and applicant contacts on Pro.
More permits in Ulster County, NY· Insulation permits· Electrical permits